0330 058 7144

Get in Touch

Discuss your EV charging requirements today

logotype

No products in the cart.

Powering Your tommorow

TECHNICAL QUERIES

SALES AND GENERAL

socials

GET IN TOUCH

Panattoni park, rotherham

CUSTOM SOLUTION

100% COMPLIANT

FUTURE-PROOF

EV Charging Infrastructure for a High Performance Logistics Development

Panattoni Park, Rotherham is an 80,870 sq ft Grade A logistics development designed with a clear focus on quality, durability and long term operational efficiency. Built to modern sustainability standards, the site targets a BREEAM rating of “Very Good” and an EPC rating of “A”, reflecting its commitment to reduced environmental impact and future ready infrastructure.

As part of this forward thinking approach, EV charging provision was a key requirement for supporting staff and visitor needs on site.

The Challenge: 

With a large-scale logistics facility comes the need for scalable, efficient EV charging infrastructure that can support high daily usage without compromising space, performance or operational flow.

The solution needed to:

  • Provide a high number of charge points within a compact footprint
  • Ensure reliable day-to-day performance in a busy commercial environment
  • Support both staff and visitor charging requirements
  • Integrate seamlessly into a modern, energy efficient development

The Solution:

Sevadis supplied and installed a robust AC charging solution tailored to the site’s operational demands.

A total of 96 Maxicharger AC charge points were installed across the development, delivered via 48 dual outlet pillars. This configuration maximises efficiency by enabling two vehicles to charge from a single unit, significantly optimising both space and infrastructure investment.

Each charger delivers 7.4kW fast AC charging, ideal for workplace and destination charging environments where vehicles are parked for extended periods.

Turnkey Solutions for Complex Developments

  • 96 Maxicharger AC charge points
  • 48 dual outlet charging pillars for space optimisation
  • 7.4kW fast charging per socket
  • 99% product reliability rate for consistent performance
  • 4G connectivity for remote monitoring and management
  • Dedicated account management for ongoing support

The Outcome: 

The installation provides Panattoni Park, Rotherham with a future proof EV charging solution that aligns with the development’s high specification, sustainability led design.

By maximising charger density through dual outlet pillars, the site benefits from:

  • Efficient use of external space
  • High capacity charging for multiple users
  • Reliable infrastructure built for continuous commercial operation
  • Smart connectivity for simplified monitoring and maintenance

The result is a scalable EV charging network that supports both current demand and future growth, reinforcing Panattoni’s commitment to sustainable industrial development.

#side-panel.side-panel .side-panel_sidebar {padding: 7.7% 11.3% 7.7% 11.3%;background-color: #ED6E26;}