0330 058 7144

Get in Touch

Discuss your EV charging requirements today

logotype

No products in the cart.

Powering Your tommorow

TECHNICAL QUERIES

SALES AND GENERAL

socials

GET IN TOUCH

Panattoni Park, Burgess Hill

CUSTOM SOLUTION

100% COMPLIANT

FUTURE-PROOF

Delivering Scalable EV Charging for a Major Logistics Hub

Panattoni is the UK’s largest speculative developer, specialising in the design, development and delivery of high quality logistics and industrial properties. At Panattoni Park, Burgess Hill, a flagship development hosting major occupiers such as DPD and Roche Diagnostics, the focus was on creating a future ready, sustainable environment for a diverse range of tenants.

Offering units ranging from 8142 to 457,733 sq ft, the site was designed to appeal to a wide variety of occupiers. A key requirement was the integration of scalable EV charging infrastructure that would support both current needs and future demand, while aligning with Part S of the Building Regulations.

The Challenge:

With sustainability at the forefront of the development, Panattoni required an EV charging solution that would:

  • Comply fully with Part S of the Building Regulations
  • Support a wide range of occupiers with varying fleet and employee needs
  • Be scalable for future expansion as EV adoption increases
  • Deliver a seamless and reliable user experience

The solution needed to integrate effortlessly into a large scale logistics environment while maintaining high performance and ease of use.

The Solution: 

Sevadis delivered a comprehensive EV charging infrastructure tailored to the needs of the site.

  • Installation of 152 MaxiCharger units in a robust, floor mounted pillar configuration
  • A future proofed and regulation compliant system, aligned with Part S requirements
  • User friendly access via RFID and smartphone connectivity, ensuring a seamless charging experience for all occupiers

This scalable approach allows tenants to adopt EV charging at their own pace, while ensuring the site is fully equipped for long term EV charging needs and expansion.

The Outcome:

The project successfully delivered a high performance EV charging solution that meets both operational and sustainability goals.

  • Over 99% fault free charging, ensuring a reliable experience for all users
  • A smooth installation process, supported by a dedicated product and installation training for contractors
  • End-to-end customer support, providing timely responses to all queries throughout the project lifecycle

Panattoni Park, Burgess Hill now benefits from a robust, future ready EV charging network that enhances its appeal to modern occupiers and supports the transition to electric vehicles.

Looking Ahead

With infrastructure in place to support growing EV demand, Burgess Hill is well positioned to accommodate the evolving needs of its tenants. The scalable design ensures the development remains compliant, competitive and sustainable for years to come.

#side-panel.side-panel .side-panel_sidebar {padding: 7.7% 11.3% 7.7% 11.3%;background-color: #ED6E26;}